Rooms

Remagen Introduces Retrofit Safe Room System Complies with ICC 500 and FEMA P-361 Standards
Rooms

Remagen Introduces Retrofit Safe Room System Complies with ICC 500 and FEMA P-361 Standards

Retrofit Safe Room Systems are designed to protect students, staff and employees in schools, police and fire stations, 911 facilities, daycare facilities, hospitals, nursing homes, dormitories, residences and office buildings. The rooms can be assembled from the inside and creates protective envelope. System features FEMA 361 labeled tornado-rated door and is protects occupants from threat from...

Read More »
Leesburg Concrete Produces Boat Ramp Restrooms For the City of Leesburg, Florida
Rooms

Leesburg Concrete Produces Boat Ramp Restrooms For the City of Leesburg, Florida

The City of Leesburg, Florida invited qualified contractors to submit sealed bids for pre-fabricated restrooms to replace existing portable toilets at two of the City operated boat ramps.  Local manufacturer and contractor, Leesburg Concrete Company, Incorporated won the bid and is pleased to have constructed this project in their home city, produced and installed by its local workforce....

Read More »
Easi-Set Precast Concrete Restrooms Benefit the National Parks System
Rooms

Easi-Set Precast Concrete Restrooms Benefit the National Parks System

Midland, Va., June 6, 2017: Easi-Set Worldwide, a subsidiary of Smith-Midland Corporation (SMID) project update. The National Parks System spans 417 areas over 84 million square acres. Since 1916, the roughly 22,000 employees strive to keep the open land in each state and U.S. territory true to its natural habitat and enjoyable for visitors. Maintaining the shelters and restrooms is part of that...

Read More »
Parameter Introduces Solution for Tobacco Testing
Rooms

Parameter Introduces Solution for Tobacco Testing

Complete room and conditioner reduces drafts for smoking machine operations BLACK MOUNTAIN, N.C. – Parameter Generation & Control, working in partnership with Cerulean, has introduced a new draft-free room and conditioner for use in tobacco, metrology and other studies. The new room and conditioner offer a special supply duct distribution system that allows for a full ceiling supply and returns...

Read More »
Considering the Low-Maintenance Building Solution
Rooms

Considering the Low-Maintenance Building Solution

Product maintenance is a wise consideration for all building investments. The Chester County Parks Recreation Department in Pennsylvania selected an Easi-Set Precast Concrete Building for a recent comfort station installation in Hibernia Park because the building requires low maintenance and can withstand whatever its natural surroundings throw at it. The 900-acre Hibernia Park is filled with...

Read More »
Rooms

Hygienic Jelly Testing Equipment meets needs of laboratories.

Drying room and GML03 laboratory depositor enable producers of jellies, such as medicated and functional gummies, to test new products whileÂ- increasing production of tested recipes to industrial scale. Allowing manufacturers to develop new recipes without disrupting production, equipment includes exchangeable pump system and choice of servo-controlled piston sizes. Depositor...

Read More »
A Fast Skyline Restroom Install
Rooms

A Fast Skyline Restroom Install

When trying to get away and relax at Georgia's Stone Mountain, no one wants to wait in line to use the bathroom. At Stone Mountain Park Campground one restroom near the park’s check-in area essentially was - an old, converted closet. With 431 campsites, 202 full hook-up areas for RVs, 189 partial hook-ups for tents, six yurts and 56 primitive tent sites, the demand for that bathroom often...

Read More »
When Nature Calls
Rooms

When Nature Calls

“Can you hear me now?” takes on a different meaning when your jobsite spans a 330-acre state park and there is no cell phone service. The crew for Smith-Midland Corp., Midland, Va., overcame this challenge and successfully manufactured and installed nine Easi-Set Buildings at Echo Bluff State Park, Eminence, Mo. Purchased in November 2013, the new park is the 88th in the state, opening this...

Read More »
Rooms

ABS Upgrades Studio, Control Rooms as Part of HD-SDI Upgrade For TVW

SEATAC, WA — With design and installation from professional video and audio systems integration firm Advanced Broadcast Solutions (ABS), TVW, the Washington Public Affairs Network, has converted its entire plant to HD-SDI to better serve its cable and online viewers. The $3.4 million project included an overhaul of three existing control rooms and master control, plus the addition of a fourth...

Read More »

All Topics