ThomasNet News Logo
Sign Up | Log In | ThomasNet Home | Promote Your Business

Newton Labs' NM200E Core Verification System Maps Nuclear Fuel Assemblies in Approximately One Hour, Helping Keep the Critical Path Short

Print | 
Email |  Comment   Share  

Newton Research Labs, Inc.
4140 Lind Ave. S.W.
Renton, WA, 98055
USA



Press release date: November 21, 2013

SEATTLE, WASHINGTON – Newton Labs, the leading developer and manufacturer of non-contact underwater measurement tools for the nuclear industry is proud to announce another rapid, accurate and routine mapping of reactor core fuel assemblies at the Braidwood Nuclear Generating Station using the new industry standard NM200E Core Verification system. All 193 fuel assemblies of the Unit 1 reactor were confirmed by the NM200E system to be correctly aligned following the 53-minute mapping session during the recent refueling outage.

The NM200E tool, which has been adopted by Exelon as their primary method for determining nozzle position in PWRs, consists of a radiation-resistant camera head and a control console running sophisticated, Newton-developed software. The Newton algorithms compensate for the visually distorting thermal turbulence and use the core baffles as positional references. The software enables the precise and consistent global mapping of fuel assembly S-hole positions, including any degree of misalignment or nozzle rotation. This is in contrast to the less accurate nozzle gap measurements by video micrometer.

Close teamwork between engineers and technicians from Exelon and Newton Labs enabled completion of the full cycle of deployment, mapping and recovery in only two and a half hours. In the past three years the same Exelon and Newton outage team has deployed the NM200E system during three previous outages at the Braidwood plant and twice at the Byron Nuclear Generating Station. The core mapping segment of the Byron outage in April 2013 was completed in only 38 minutes. 

The Exelon outage team travels with a containerized pair of NM200E systems that are shared among three of the Exelon generating stations, Braidwood, Byron and Three Mile Island. The systems' camera heads, manufactured by Newton Labs in 2010, have each been deployed multiple times in high radiation environments and have not required adjustment or refurbishment.

About Newton Labs
Seattle, Washington based Newton Labs is a privately held manufacturer of machine vision, robotics and optical automation. A spin-off of the Massachusetts Institute of Technology (MIT), the company has for more than 18 years developed and marketed high-performance, computer-driven automation for industrial processes. Newton Labs has deployed more than 20,000 machine vision, robotic and automation systems worldwide. Newton markets NM200E systems worldwide, along with its companion product, the NM200UW Nuclear Underwater Laser Scanner.




Public Relations Contact:
Eric Yates
eyates@newtonlabs.com 
425-251-9600


Print | 
Email |  Comment   Share  
Contacts: View detailed contact information.


 

Post a comment about this story

Name:
E-mail:
(your e-mail address will not be posted)
Comment title:
Comment:
To submit comment, enter the security code shown below and press 'Post Comment'.
 



 See related product stories
More .....
 See more product news in:
Computer Hardware and Peripherals
Machinery and Machining Tools
Software
Test and Measuring Instruments
Vision Systems
 More New Product News from this company:
Underwater Laser Scanner is optimized for distance, imaging area.
Underwater Laser Scanner provides in-vessel reactor measurements.
More ....
| Featured Manufacturing Jobs
 Other News from this company:
Routine Core Verification of Byron Unit 1 Completed in 49 Minutes Using the Newton Labs NM200E System
Scheduling of in-Vessel as-Built Measurements by Underwater Laser Scanner during Outages Gains Wider Acceptance from Nuclear Operators
Fast, Accurate Smooth and Routine, Core Verification of Byron Unit 2 is Completed in Only 38 Minutes at End of April's Outage
Nuclear Energy Institute Presents Exelon with a "Top Industry Practice" Award for Deployment of a Fuel Alignment Measurement System by Newton Labs
More ....
 Tools for you
Watch Company 
View Company Profile
Company web site
More news from this company
E-mail this story to a friend
Save Story
Search for suppliers of
Measuring Software
Industrial Automation Software
Facilities Management Software
Machine Vision Systems
Computer Mapping Systems
Industrial Inspection Automation Systems
Assembly Automation Systems
Assembly Automation Equipment
Join the forum discussion at:
Engineers Lounge
The Machine Shop
Wired In


Home  |  My ThomasNet News®  |  Industry Market Trends®  |  Submit Release  |  Advertise  |  Contact News  |  About Us
Brought to you by Thomasnet.com        Browse ThomasNet Directory

Copyright © 2014 Thomas Publishing Company. All Rights Reserved.
Terms of Use - Privacy Policy



Error close

Please enter a valid email address