Pipe Clamps

Hydra-Zorb Launches Two New Products
Pipe Clamps

Hydra-Zorb Launches Two New Products

New products complement Hydra-Zorb market leadership in pipe clamping solutions AUBURN HILLS, Mich., May 17, 2017 - Hydra-Zorb Co., the leading manufacturer of today's standard for clamping pipe or tube in the hydraulic, pneumatic and HVAC/R industries, announced the launch of its latest technology innovations, the Bronco Tube and Pipe Saddle and the Titan Riser Clamp. Both products were recently...

Read More »
Hydra-Zorb Launches Two New Products
Pipe Clamps

Hydra-Zorb Launches Two New Products

New products complement Hydra-Zorb market leadership in pipe clamping solutions AUBURN HILLS, Mich., May 17, 2017 - Hydra-Zorb Co., the leading manufacturer of today's standard for clamping pipe or tube in the hydraulic, pneumatic and HVAC/R industries, announced the launch of its latest technology innovations, the Bronco Tube and Pipe Saddle and the Titan Riser Clamp. Both products were recently...

Read More »
ELM Measurement Modules features a flexible connector front-end.
Pipe Clamps

ELM Measurement Modules features a flexible connector front-end.

Including 11 modules with different interfaces and input circuitry, ELM series modules feature new metal housings that optimize shielding and cooling in measurement technology applications. Unit offers 24 bit resolution, sampling rates up to 50,000 samples per second, depending on interface and precision timing of synchronization < 1 μs. Measuring accuracy of 100 ppm at 23 °C, device ensures...

Read More »
ELM Measurement Modules features a flexible connector front-end.
Pipe Clamps

ELM Measurement Modules features a flexible connector front-end.

Including 11 modules with different interfaces and input circuitry, ELM series modules feature new metal housings that optimize shielding and cooling in measurement technology applications. Unit offers 24 bit resolution, sampling rates up to 50,000 samples per second, depending on interface and precision timing of synchronization < 1 μs. Measuring accuracy of 100 ppm at 23 °C, device ensures...

Read More »
Vertical Acting Toggle Clamps feature vertical mounting base.
Pipe Clamps

Vertical Acting Toggle Clamps feature vertical mounting base.

Made of case-hardened sheet metal, zinc-plated, with blue passivated finish, GN 810.1 Universal Fit Steel Vertical Acting Toggle Clamps work according to toggle principle, as lever and clamping bar move in same direction. Products in U-bar version with 2 flanged washers can accommodate application specific clamping screw. Version including spindle assembly with neoprene rubber tip is available as...

Read More »
Vertical Acting Toggle Clamps feature vertical mounting base.
Pipe Clamps

Vertical Acting Toggle Clamps feature vertical mounting base.

Made of case-hardened sheet metal, zinc-plated, with blue passivated finish, GN 810.1 Universal Fit Steel Vertical Acting Toggle Clamps work according to toggle principle, as lever and clamping bar move in same direction. Products in U-bar version with 2 flanged washers can accommodate application specific clamping screw. Version including spindle assembly with neoprene rubber tip is available as...

Read More »
Boiler Tube Joint Alignment Tool helps minimize weld failure.
Pipe Clamps

Boiler Tube Joint Alignment Tool helps minimize weld failure.

Made of precision machined high strength steel, Esco HOG TIE-® Boiler Tube Weld Alignment Clamp rapidly and accurately aligns boiler tube ends to minimize risk of failure from misalignment when welding water wall boiler tubes. One side has 2 through-holes and other has threaded inserts which accept 2 bolts that draw them together, exposing tube ends for tack welding before removal to finish...

Read More »
Boiler Tube Joint Alignment Tool helps minimize weld failure.
Pipe Clamps

Boiler Tube Joint Alignment Tool helps minimize weld failure.

Made of precision machined high strength steel, Esco HOG TIEÂ-® Boiler Tube Weld Alignment Clamp rapidly and accurately aligns boiler tube ends to minimize risk of failure from misalignment when welding water wall boiler tubes. One side has 2 through-holes and other has threaded inserts which accept 2 bolts that draw them together, exposing tube ends for tack welding before removal to finish...

Read More »

All Topics