Clock Generator targets GPS-based timing applications.

Clock Generator targets GPS-based timing applications.

Operating from +3.3 V supply, TCXO-based Model FTS250 provides 1 pps CMOS output and generates 10 MHz CMOS and 10 MHz SINE output from voltage controlled crystal oscillator. Mixed signal PLL device can lock to 10 MHz reference derived from onboard GPS receiver, or to external 10 MHz or 1 pps reference. Alarms are provided to indicate Loss-of-Lock, Holdover, and Antenna Fault. Housed in 2.9 x...

Read More »
Gas Standards Generator affords flexible operation.

Gas Standards Generator affords flexible operation.

FlexStream(TM) dilutes emission from permeation or diffusion tubes with inert gas to create trace concentration - ppm, ppb, pptr - gas mixtures. Featuring internal microprocessor that sets operating mode and adjusts dilution flows to achieve desired concentrations, modular system also offers up to 6 independently controlled channels that can consist of permeation units or combination of...

Read More »

Timing Devices extend battery life for portable electronics.

VersaClockÂ-® LP programmable clock generators reduce power consumption and optimize board layout in battery-operated consumer applications. They reduce power requirement to 4-8 mW for single clock output and also reduce power usage during power down (20 Â-µW) and sleep mode with 32 kHz clock active (200 Â-µW). Each of 5 models features 4 internal PLLs, individually programmable and...

Read More »

Vector Signal Generator tests base station receivers in real-time.

Equipped with SMU-K69 closed-loop BS test option, Model SMU200A supports real-time processing of feedback information in LTE base station receiver tests. Option enables signal generator to process Hybrid Automatic Repeat Request feedback as well as uplink timing adjustment commands from base station, then adapt LTE signal dynamically in line with 3GPP TS 36.141 test specification.

Read More »
High Voltage Pulse Drivers deliver low jitter outputs.

High Voltage Pulse Drivers deliver low jitter outputs.

Powered by external 12 V plugin supply, model T750 features 4 channels, each with logic-level input and isolated HV pulse output, while model T760 has 2 channels, each with fiberoptic inputs and isolated HV electrical outputs. They provide transformer-isolated pulse outputs, which are user adjustable from 5-100 V into 50 W load, with rise and fall times of 2 nsec. Both units are packaged in...

Read More »

Siemens to Supply Solar Receivers for New Solar Power Plant in Spain

Siemens Energy has received an order to supply solar receivers to Spain. Purchaser is a consortium between ABANTIA and COMSA EMTE, which will act as EPC (Engineering, Procurement and Construction) to develop a solar thermal power plant in Les Borges Blanques in the province of Lleida in Northeastern Spain. Siemens will deliver the solar receivers UVAC (Universal Vacuum Air Collector) which will...

Read More »

Caterpillar Inc. Announces Generator Set Technology Portfolio to Meet Tier 4 Interim Emissions Standards

Peoria, Ill. - Caterpillar Inc. announced today its portfolio of technologies to meet Tier 4 Interim emissions regulations for mobile and stationary generator sets. Building on a legacy of diesel engine expertise, we are ready to meet the next phase of emissions compliancy, said William J. Rohner, vice president of Caterpillar Electric Power Division. Diesel Engine Regulations Beginning January...

Read More »
Generator/Welder Combination has space-saving design.

Generator/Welder Combination has space-saving design.

Designed for service vehicle applications, combination unit features Kubota Z-482, 12 hp, water-cooled diesel engine; direct-coupled, 2-pole generator with 6 kW output; and 300 A DC welding output. Up to 500 A, 12/24 V jump start and up to 160 A, 12/24 V battery charging capabilities are standard. Able to fit inside vehicle side compartment without overheating, unit measures 30 x 16 x 21 in....

Read More »
Siemens Receives Order for Steam Turbine-Generator from England - Delivery Scheduled in a Mere 13 Months

Siemens Receives Order for Steam Turbine-Generator from England - Delivery Scheduled in a Mere 13 Months

Siemens Energy has received a follow-up order for the supply of an SST-400 steam turbine-generator as an extension to the turbine building in the chemical industrial park in Wilton, UK. Purchaser is the park operator Sembcorp UK. The turbine with generator and auxiliary systems is scheduled to leave the Siemens turbine factory in Görlitz after only 13 months. The SST-400 industrial steam...

Read More »

GE Energy Announces $200 Million Service Contract with Emirates Aluminium for World's Largest Single-Site Aluminum Smelter

Agreement with EMAL Supports Goal to Ensure Reliable Power Supply for the Plant ABU DHABI, UAE--06 April 2009-- GE Energy today announced a multi-year contractual service agreement (CSA) with Emirates Aluminium (EMAL) as it nears completion of what will become the world's largest single-site aluminum smelter complex. The CSA will support EMAL's recent investment in GE gas turbines and the...

Read More »

All Topics