They say it’s all in a days work. For the PECO Gas Works facility in Conshohocken, Pa., it was all in 90-minutes of installation on a Saturday morning.



PECO needed to replace a 10’ x 10’ building to hold additional equipment and several hazardous material above-ground storage tanks, which have a 7,000-pound load when filled with product. To accommodate this, a solid floor section was cast beneath each tank to support the applied load.



The replacement structure is a 10’ x 24’ Easi-Set Building with 4”-thick non-insulated walls and a 12”-thick floor slab with a 6”-containment depth covered with 1 1/2”-thick fiberglass grating in the non-storage tank areas. The interior ceiling is 8’. This building was manufactured by Easton, Pa.-based Oldcastle Precast Inc., one of 70 licensed precast concrete producers in 10 countries that manufacture Easi-Set products. The concrete exterior walls have a split face block formliner finish stained with Sherwin-Williams HC concrete stain. Stainless-steel brackets and hardware were used to assemble the wall panels because of the corrosive atmosphere.



The building was customized with an exterior stainless-steel ball valve, with a plug cap, to drain the containment area. Aluminum conduit/piping pass-thru panels were also installed over 1’ x 2’ wall openings at multiple locations on the perimeter.



The building was placed in very tight conditions between existing structures. Riggers from George Young & Co., Philadelphia, together with a crane from Sautter Crane Rental, Philadelphia, were utilized to set the building under the technical advice of Oldcastle Easi-Set Building Division Foreman Rick Morrison.



On May 21, the building arrived at 7 a.m. and was in place by 8:30 a.m. Of course hours of designing, planning, manufacturing, safety meetings and a little more preparation by all the team players had to happen before delivery and installation. It took all of this to make a 90-minute day of work a complete success.



PECO Gas Works facility, Conshohocken, Pa.

Easi-Set Worldwide licensed producer: Oldcastle Precast Inc., Easton, Pa.

Product: 10’ x 24’ x 8’ Easi-Set Building

Rigging: George Young Co., Philadelphia

Crane: Sautter Crane Rental, Philadelphia

Hauling: R. T. Hankinson Trucking, Ottsville, Pa.

Building owner: PECO Energy Gas Works Division (an Exelon Company), Conshohocken


Contact This Company

More from Architectural & Civil Engineering Products

All Topics

COVID-19 Response Suppliers COVID-19 Response:
Can Your Company Help Provide Critical Supplies?

We are using the power of our platform to aid in the mass shortage of critical supplies. If your company can help provide supplies, capabilities, or materials for products such as N-95 Masks and Tyvek SuitsPlease let us know.

COVID-19 Response Suppliers