Processing of Long Leads in Small Spaces


The Alpha 358 automatic crimping machine from Komax is designed for two-sided crimping and seal loading of wires up to 985 inches (25 meters) on a machine just 158 inches in length. Coiling and binding wires right on the machine frees up substantial floor space while assuring less possibility of damaged connector parts.

The coiler speed is synchronized with the wire drive while the tension on the conductor is constantly monitored. Gentle coiling is attained without the need for lengthy deposit units.

The Alpha 358 is designed to be equipped with the latest seal applicator from Komax, the MCI 765. The unit carries a Seal Position Measurement (SPM) which monitors the seal position on the wire to assure that it is within the tolerances.

Automatic pull-out force measurements are also available. The Alpha 358 does the pull test automatically and the results are transferred to the user software and compared with the pre-set values. As with the crimp height measuring device, production cannot be started until the measured results match the specified values. With an optional barcode scanner the material is scanned prior to the start of production and compared with the specified values. This step prevents material from getting mixed up with each other.

Processes are constantly monitored during production. Any wires with processing defects are removed and an appropriate number of cables are post-processed automatically to replace them.

For more information contact Komax Corporation. 1100 E. Corporate Grove Drive, Buffalo Grove, Illinois 60089/USA. Toll-Free: 1-888-GO-KOMAX (1-888-465-6629). Phone: 1-847-537-6640. Fax: 1-847-537-5751. Web Site: www.komaxusa.com

FOR MORE PRODUCT INFORMATION, CONTACT:

Patrick Boyer at Komax
Phone: 1-888-465-6629 x3103
Fax: 1-847-537-5751
E-mail: patrick.boyer@komaxgroup.com

More from Health, Medical, & Dental Supplies and Equipment

All Topics