New Cleaver Brooks Boilers Come with Hydrostatically Tested Blowdown Valves

Press Release Summary:

Energy Equipment company offers 1991 400 HP and 1999 300 HP Cleaver Brooks Boilers with 4 pass dry back and 150 PSI design pressure. Units come with manual reset, operating limit and modulating limit steam pressure controls. The boilers are re-wired to for 460/3/60 volt AC and are electronically and mechanically tested to detect and replace defective components. Units are installed with new fireside and waterside gaskets.


Original Press Release:

Energy Equipment Company is Proud to Announce Two Ready-to-Ship Refurbished Boilers: 1991 400 HP Cleaver Brooks Boiler and the 1999 300 HP Cleaver Brooks Boiler

1991 400 HP Cleaver Brooks boiler, 4 pass dry back, 150 PSI design pressure, natural gas fired. The boiler has been cleaned on the fireside, waterside, outside, and painted. The pressure vessel and tubes, trim piping, and blowdown piping and valves have been hydrostatically tested. New fireside and waterside gaskets have been installed. New control and electrical distribution panels have been installed. The boiler has been re-wired for 460/3/60 volt AC. New Honeywell 7800L Series (or equal Fireye) Flame Safeguard Controls will be installed. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit steam pressure controls have been installed. A new Honeywell Mod Motor has been installed. The boiler has been electrically and mechanically checked throughout to identify and replace any defective components. New relief valves will be shipped loose for field installation. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup.

1999 300 HP Cleaver Brooks, 4 pass dry back, 150 PSI design pressure, natural gas and No. 2 oil fired. The boiler has been cleaned on the fireside, waterside, outside, and painted. New blowdown valves and piping have been installed. The boiler pressure vessel, tubes, piping, and blowdown valves have been hydrostatically tested. The Honeywell Flame Safeguard Controls have been checked and proven good. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit Controls will be installed. New gas pressure switches have been installed. New McDonnel Miller primary LWCO and secondary LWCO heads have been installed. A new Honeywell Mod. motor has been installed. The boiler has been electrically and mechanically checked to identify and replace any defective components. The boiler as quoted is wired for 460/3/60 supply voltage and "on/off" pump controls for water level control. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup.

We will give a 1 year parts replacement warranty on the controls on each of these boilers.

Contact:

www.energyco

Dave Brannon

Energy Equipment Co., Inc.

864-316-4028

www.energyequipco.com

Contact This Company

All Topics