Mezzanines are designed for ease of installation.
Press Release Summary:
IBC 2000 compliant mezzanines feature pre-welded clips for all structural connections, panelized guard rail systems, and pre-welded stair assembly. Gussetted beam seats for beams and girders simplify positioning of heavy structural components.
Original Press Release:
PK Structures Mezzanines Designed for Fast, Easy Installation
September 3, 2003 - St. Louis, Mo. - PK Structures mezzanine systems from Porta-King are designed to enable faster, easier installation than competing mezzanines.
Additional fabrication of components at the factory equates to up to 40% less time needed for field assembly after the mezzanine is delivered.
PK Structures IBC 2000 compliant mezzanines feature pre-welded clips for all structural connections, panelized guard rail systems and pre-welded stair assembly, which all expedite installation. Gussetted beam seats for beams and girders simplify the positioning of heavy structural components.
Porta-King Structures provides turnkey integration solutions for mezzanines and in-plant wall systems and enclosures. To receive free literature detailing the differences between PK Structures mezzanines and competitors' mezzanines, contact Gregg Pearlstone at Porta-King, 1-800-456-5464, or visit www.portaking.com.