Channel Grinder includes pre-engineered FRP manhole.

Press Release Summary:




Constructed with built-in channel set up for standard TASKMASTER TM8500 channel grinder, Manhole System can quickly be up and running, protecting downstream equipment. Design enables users to access grinder by just lifting hatch. Custom designed to match site requirement, grinder manholes are available complete with access ladder, choice of hatches and optional grinder guide rails, fully submersible drive motors and control systems.



Original Press Release:



Taskmaster® Grinder Installed with FRP Manhole



Custom Designed for your Site

Franklin Miller TASKMASTER grinders are now available complete with a pre-engineered FRP manhole.

This complete manhole makes installation a snap - simply dig a hole, drop it in and hook it up! The system is constructed with a built-in channel set up for a standard TASKMASTER TM8500 channel grinder. The complete manhole system can quickly be up and running, protecting downstream equipment and providing savings for the district. The Manhole design makes accessing the grinder as easy as lifting a hatch.

Franklin Miller Grinder Manholes are custom designed to match the site requirements. They are available complete with access ladder, a choice of hatches and optional grinder guide rails, fully submersible drive motors and control systems.

For more information contact Franklin Miller Inc. 60 Okner Pkwy, Livingston, NJ 07039; 973-535-9200; fax 973-535-6269; www.franklinmiller.com; email: marketing@franklinmiller.com

Contact This Company

All Topics